A] Power/Energy, Technical and Corporate Management
Accomplished
a turn‑around in Operations nationwide in three years, as Vice-President
for Utility Operations of the National Power Corporation of the Philippines
(NAPOCOR):
From year-to-year losses,
to profitability, making the equivalent gross income of US$1 billion in
1983 on operating assets in excess of US$10 billion; Energy-Efficiency
projects generated the equivalent of US$15 million savings in 1983
Complied, in 1983, with
the loan covenants on "rate of return on rate base" (RORB) with
the World Bank and the Asian Development Bank for the first time in
NAPOCOR's 40+ years history
Achieved technically
acceptable reliability and efficiency in all the electric grids in the
country (power plants, substations, transmission lines) to meet the performance
standards of IEEE
Re-established the
National Power Corporation's financial and technical viability through a decentralized
organization.
B] "My vision of Energy" moves towards the
more sustainable.
ENERGY.
The "New Energy" concept is an approach that enables us to psychologically alter our consciousness. It allows us to treat the pursuit for new energy as an investment. As such, it carries with it an internal rate of return and payback. It is NOT like cost that flows down the river never to be recovered ever. Our planning and conceptualization is often colored by psychological preconceptions and baggage that engineering practice has imposed upon us.
New Energy is that which a process would ordinarily waste into the atmosphere, but which we have succeeded in recovering in order to produce more work. Processes have inherent inefficiencies, and this includes combustion cycles. As we find ways of making them efficient, we will have successfully mined new energy. New energy is also that which we "harvest" from our environment. And we now call it "renewable energy"..
C]
Energy-Efficiency Project.
Successfully gained approval from the Governing Board of First
Private Power Corporation in the Philippines for Stage 1 (US$65-million) of a 2‑Stage
co‑generation facility to produce and supply
electricity, process steam
at 10 bars and chilled water at 7 deg C
resulting in a design
overall thermal efficiency better than 60%
I conceptualized and was
project leader for the all the preparatory work, leading up to and
including bidding, for this Stage 1, with an output of 65 mW(electric)
and 50 mW(thermal), that we implemented in 1999 with international
bidders participating.
D] Developed Financial Models and Undertook Feasibility Studies for the preparation of bid
documents for power plant projects:
·600 mW Pumped-Storage hydro
·conventional hydros
·diesel-electric power plants
·geothermal power plants
E] “Energy Adviser” for Undergraduate Engineering and
Master’s Theses, and “Energy Expert Resource” at the Ateneo de Manila
University. Responsibilities included:
Adviser: Graduate and Undergraduate Research in Energy
Adviser: Undergraduate Research in Automation and Controls
Adviser: Power Electronics, Computer Interfacing, Analog and Digital Controls
Designed and Built Prototype: Hybrid-Electric Vehicle Design and Implementation
The classroom is a platform for the growth of human beings. Teachers manage this platform to facilitate the creation of an environment where the human being’s “freedom to think” is unleashed and enhanced.
F] Other Positions Held:
·Vice President for Project Development
·Vice President for Power Utility Operations
·Vice President for Human Resources
·Chairman, Energy Committee of the Philippine Chamber of Commerce and Industry
·Head, Human Resources Development Division
·Chief, Nuclear Plant Systems Division
·Chief, Nuclear Training Section
·Nuclear Instrumentation Technologist, 3-mW(thermal) Nuclear Research Reactor
From losses to profitability in 3 years, complying with Covenants with the ADB and the World Bank with respect to Rate of Return on Rate Base, for the first time)